top

Company

Quality and Certificates

HWPD defines inspection requirements around the approved drawing, material, process and acceptance criteria. Incoming, in-process and final checks are documented according to the agreed project quality plan.

Optical measurement system inspecting dimensional accuracy of precision manufactured components
Per plan
Incoming Checks
By project
Quality Targets
By requirement
Capability Review
Documented
Inspection Records

Project Quality Planning

Quality Control Across the Full
Production Cycle

Quality isn’t a final inspection step — it’s built into every stage of our process, with defined checkpoints, documented criteria, and traceable records throughout.

01

Incoming Material Inspection

Incoming material checks are planned around the specified resin or steel grade, supplier documentation and any customer-specific verification requirements.

02

In-Process Monitoring

Statistical Process Control (SPC) tracks key parameters during molding, with operators trained to catch deviations before they produce defective parts.

03

Dimensional & CMM Inspection

Coordinate Measuring Machines verify critical dimensions against engineering drawings, generating documented first-article and periodic inspection reports.

04

Final Outgoing Inspection

Finished products undergo outgoing inspection according to the approved inspection plan and acceptance criteria. Inspection may include visual checks, dimensional verification, functional testing, sampling, or 100% inspection where required by the project.

Inspection Equipment

Metrology Lab Equipment

Available inspection equipment supports dimensional, material and functional checks. Applicable method, range, equipment capability and reporting are confirmed in the project inspection plan.

Protection Measure
Function
Accuracy
CMM
Dimensional verification against drawing / CAD
Per calibrated equipment specification
Optical Measuring System
2D profile and contour measurement
Per equipment specification
Surface Roughness Tester
Ra / Rz measurement
Per equipment specification
Hardness Tester
Material / tool hardness verification
Applicable hardness scale
Spectrometer
Material composition analysis
According to applicable test method
Color Spectrophotometer
Color difference measurement
Project-defined ΔE acceptance criteria
Tensile Testing Machine
Strength and elongation testing
According to applicable material/test standard
Salt Spray Test Chamber
Corrosion-resistance testing
Applicable salt-spray test method, e.g. ASTM B117 where specified

Measurement capability shown is equipment-specific and subject to calibration status, fixture, measurement method, part geometry, and environmental conditions.

8+

Inspection & Lab Instruments

FAI Support

First Article Inspection

Scheduled

Calibration & Equipment Verification

Requirement-Based

Inspection Record Retention
Our Quality Philosophy

Built on Prevention, Not Just Detection

Catching Issues Before They Become Defects

The most expensive defect is the one discovered after shipment. Our quality system is designed around prevention — DFM review at the design stage, mold flow analysis before tooling, and SPC monitoring during production all work together to catch potential issues long before a part reaches final inspection.

Project-Specific Production Traceability

Traceability can be configured according to project and customer requirements and may include material lot, production batch, machine, mold cavity, operator, inspection records, and individual-part identification where required. This allows relevant production records to be reviewed efficiently when a quality question or investigation arises.

Continuous Improvement as Standard Practice

Nonconformities, customer complaints, and audit findings are reviewed according to their severity, risk, and applicable quality procedures. Root-cause analysis, corrective action, containment, and effectiveness verification are applied where required.

Coordinate measuring machines for precision dimensional inspection of injection molds and molded parts

Supporting Certifications

CURRENT CERTIFICATES AND DEFINED SCOPES

Current certificate copies should be checked for the certified legal entity, site, scope and validity period. Project requirements outside a certificate scope are controlled through the agreed quality plan.

HWPD & HWTC QUALITY RESPONSIBILITIES

HWPD coordinates project quality planning; HWTC Molding manages production-floor quality controls.

View HWTC Molding certifications →
ISO 9001:2015 certificate for Kunda Mould (Shenzhen) Co., Ltd.
Quality Management

ISO 9001:2015

Quality management system certification covering the manufacture of plastic injection molded parts and the design and manufacture of injection molds.

Certification bodyDEKRA Certification GmbHCertificate No.80116006/3-2Validity1 May 2024 – 30 April 2027
ISO 14001:2015 certificate for Kunda Mold (Shenzhen) Co., Ltd.
Environmental

ISO 14001:2015

Environmental management system certification covering activities related to injection molded parts manufacturing and injection mold design and manufacturing.

Certification bodyGuardian Independent Certification Ltd (GICG)Certificate No.U24E2GZ8030510R0MValidity28 August 2024 – 27 August 2027
IATF 16949:2016 certificate for Kunda Mould (Shenzhen) Co., Ltd.
Automotive

IATF 16949:2016

Automotive quality management system certification covering the manufacture of plastic injection molded parts. The certified scope excludes product design under Clause 8.3.

Certification bodyDEKRA Certification GmbHIATF No.0514610Certificate No.160116003/3Validity1 May 2024 – 30 April 2027

Need Certified Documentation for Your Project?

Request certificate copies, audit summaries, or schedule a supplier qualification audit with our quality team.